Wind Power Policy
- Concession on import duty on specified wind turbine components.
- 10 year income tax holiday for wind power generation projects.
- Concessional custom duty exemption on certain components of wind electric generators
- 100% exemption from excise duty on certain wind turbine components.
- REC Mechanism.
- Waiver of Inter State Transmission System (ISTS) charges and losses for inter-state sale of solar and wind power for projects to be commissioned up to March, 2022.
- Permitting Foreign Direct Investment (FDI) up to 100 percent under the automatic route.
- Notification of standard bidding guidelines to enable distribution licensee to procure wind power at competitive rates in cost effective manner.
- Declaration of trajectory for Renewable Purchase Obligation (RPO) up to the year 2022.
- Implementation of Green Energy Corridor project to facilitate grid integration of large-scale renewable energy capacity addition.
- Technical support including wind resource assessment and identification of potential sites through the National Institute of Wind Energy, Chennai.
- IREDA finance scheme for wind power projects.
- Special incentives provided for promotion of exports from India for various renewable energy technologies under renewable sector specific SEZ.
- Feed-in-Tariff (FIT) scheme for wind projects upto 25 MW.
- Accelerated Depreciation – ended in 2017
- GBI scheme for grid interactive wind power projects commissioned before 31 March 2017.
Policy documents
5th August Final Repowering Policy of the Wind Power Projects
Date Added :
25-Jul-2019
7th August 2018 Indias First 1.0 GW Offshore wind project at Gujarat
Date Added :
25-Jul-2019
Amendment waiver of inter state transmission charges and losses Wind and Solar
Date Added :
25-Jul-2019
Direction to the CERC under section 107 change in law
Date Added :
25-Jul-2019
National Wind Solar Hybrid Policy
Date Added :
25-Jul-2019
National Offshore Wind Energy Policy
Date Added :
25-Jul-2019
Proposed amendment to Elelctricity Act 2003
Date Added :
25-Jul-2019
Repowering Policy of the Wind Power Projects
Date Added :
25-Jul-2019
Resolution on wind Bidding Guidelines dated 8th Decemeber 2017 Eng
Date Added :
25-Jul-2019
RPO trajectory 2019-22 Order dated 14 June 2018
Date Added :
25-Jul-2019
The great Indian Bustard
Date Added :
25-Jul-2019
Wind Data Sharing Policy
Date Added :
25-Jul-2019
Wind Power Conf. by JKJ MNRE 21112016
Date Added :
25-Jul-2019
Amendment of the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects
Date Added :
25-Jul-2019